Frame contract for routine maintenance and management of the Petrochemicals area of Ferrara from 2011 to 2019 and the Petrochemicals area of Ravenna from 2016 to 2019.
Supply and installation of electrical panels and work to adapt regulations in the cabin C70/2/a, DMS Petrochemical Area of Ferrara.
Renovation of the cooling water lighting system, fan pian and north and south walls of the towers in the Petrochemical area of Ferrara. Fiber optic laying for logistic data transmission.
Activity of search of Medium Voltage cables.
Transformer replacement 15/6kV.
Construction of VRV air conditioning system in contrai room, logistics rooms, offices and meeting rooms of Vara Ferrara plant.